TORONTO, J(GLOBE NEWSWIRE) - Probe Metals Inc. This new resource will form the basis of the PEA expected in Q3-2021ĭrilling continues at the Val-d’Or East Project, with 50,000 metres of additional drilling in 2021 Monique and Pascalis gold deposits will form the cornerstone of the upcoming Preliminary Economic Assessment (“PEA”), representing 77% of the pit-constrained Mineral Resource Estimate Monique deposit is a standout performer, more than doubling its current resource to 660,400 M&I and 643,500 Inferred with over 90% within the current mining lease The resource estimate demonstrates significant increase in Measured & Indicated (“M&I”) ounces, continued expansion of the gold resource and potential future resource upsideġ6% increase in total ounces, 2.68M ounces in pit constrained resource and 1.30M ounces in underground resource Block Model 3D view – Courvan Gold Trend Area Block Model 3D view – Courvan Gold Trend Area
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |